Schüßler-Plan Homepage
Enterprise Service range Contact Jobs home Deutsch
 
Structural engineering
Airport construction
Concrete and steel bridge construction
Railway construction
Road construction
Tunnel construction
Construction and project management
Surveying
Landscape and environmental planning
Development planning
Structural engineering
 
Airport construction
Concrete and steel bridge construction
Railway construction
Road construction
Tunnel construction
Construction and project management
Surveying
Landscape and environmental planning
Development planning
A14 Magdeburg-Halle, route-remote compensation measures

Landscape preservation final planning of the motorway A 20

Environmental impact study motorway A14 Magdeburg-Wittenberge-Schwerin, newly built section, Federal State of Mecklenburg-Vorpommern

Environmental impact study Federal Road B196, by-pass

Landscape preservation final planning of the motorway A 20

As an example for a focal point in the field of landscape and environmental planning stands the elaboration of the accompanying landscape conservation plan integrating a FFH (flora-fauna-habitat)
tolerance test for the by-pass of the B1n in Küstrin-Kietz directly before the border crossing point to Poland located there. In particular, the crossing of the Oder meadowlands with the nature preserves
„Oderinsel Kietz“ and the EU-bird sanctuary „Deichvorland Oderbruch“ involves a lot of conflict potentials with the interests of nature and landscape. By building the route between two existing traffic routes, the old B1 and the railway, as well as the design optimization of the bridge constructions, interferences could be avoided and already significantly reduced in the run-up phase. Additionally, landscape preservation compensation measures costing approx. 0.7 million Euro are realised in order to compensate for the interferences necessary for this project. They include among others the reduction of a total of 4.5 ha of developed area and the development of natural deciduous forests in an area of 4 ha.

Country:
Germany, Federal State of Brandenburg

Building owner and originator:
Administration of Road Construction of Brandenburg, Road Construction Authority Frankfurt/O.

Planning time:
2001-2002

Work carried out:

- environmental tolerance study stages 1-5
- FFH tolerance test