Schüßler-Plan Homepage
Enterprise Service range Contact Jobs home Deutsch
 
Structural engineering
Airport construction
Concrete and steel bridge construction
Railway construction
Road construction
Tunnel construction
Construction and project management
Surveying
Landscape and environmental planning
Development planning
Structural engineering
 
Airport construction
Concrete and steel bridge construction
Railway construction
Road construction
Tunnel construction
Construction and project management
Surveying
Landscape and environmental planning
Development planning
A14 Magdeburg-Halle, route-remote compensation measures

Landscape preservation final planning of the motorway A 20

Environmental impact study motorway A14 Magdeburg-Wittenberge-Schwerin, newly built section, Federal State of Mecklenburg-Vorpommern

Environmental impact study Federal Road B196, by-pass

Landscape preservation final planning of the motorway A 20

In the course of the traffic project Federal Motorway A 20 Lübeck - Stettin, section Neubrandenburg – Pasewalk, a number of compensation and substitution measures are planned in an area of approx. 550 hectare in the direct catchment area of the Great Koblentz lake. The measure zone is situated in the rural district of Uecker-Randow, approx. 6 kilometres northeast of the town of Pasewalk, between the municipalities of Krugsdorf and Koblentz. The substitution measure “Koblentz lake“ consists of four partial measures:

 

 

- rewatering of extensive fenlands
- enclosure of the whole measure complex with a fixed pasture fence and within this area another subdivision into three large pasture zones
- conservation and development of extensive green lands rich in species and appropriate to the site as well as
- monitoring (University of Greifswald)

 

During the planning of the pasture enclosure of a length of approx. 30 kilometres, the characteristics of the fen site on the one hand and extensive aspects of nature conservation on the other hand had to be considered since the planning area is at the same time a natural preserve and a bird sanctuary.

The following construction work was carried out: erection of a modern fixed electric enclosure facility (approx. 30 kilometres) with three bracing wires, erection of a mobile pasture fence (approx. 3,800 metres) with two bracing wires, installation of 6 cattle barriers including foundation improvement for guaranteeing the weight-carrying capacity, erection of 8 pedestrian gates, integration of 18 fixed gates as well as 43 mobile gates for the following extensive cattle grazing of the area and the installation of 4 lifting barriers.


Country:
Germany, Federal State of Mecklenburg-Vorpommern

originator:
DEGES GmbH (DEGES Ltd)

Planning period / construction period:
planning 2005/ construction period: September – November 2005

Work carried out:
- plausibility check of final planning, preparation of award of contract, participation in the award, object control, object supervision and documentation