|
|
||||||||
|
|
|
|
Lowering of the Rheinufer street Düsseldorf The lowering of the Rheinufer street was a recognized redevelopment in the field of city planning covering an area of 27 ha and an entire length of 2600 m. The 1930 m long Rheinufer tunnel was the core of the project. It has a tube with two lanes and a hard shoulder in each direction. On a length of approx. 1000 m the tunnel tubes are positioned on top of each other. Further characteristics: underground link to an underground car park with approx. 900 parking spaces in the section of a two-storeyed tunnel, underground and junction-free link to the city centre, construction of the lower part of the two-storeyed tunnel by means of the compressed air method. Country: Germany, Federal State of Nordrhein-Westfalen Building owner and originator: Capital of State Düsseldorf Construction period: 1990-1993 Construction costs: 291.43 million Euro Work carried out:
|