National motorway A 17 Dresden-federal border, section from A 4 to junktion with B 170 The national motorway A 17 between Dresden and the federal border with connection to the motorway to Prague closes a gap on the north-south-axis of the Central European main road network. One part of the route runs through a sensitive area of the Dresden periphery and for this reason nearly 4 km were built underground. The tunnel Dölzschen is 1070 m, the tunnel Coschütz 2337 m long. The two are connected by the Weißeritztal bridge. Country: Germany, Free State of Saxony Building owner and originator: Motorway Authority of Saxony Construction period: 1999-2001 Construction costs: 360 million DM Work carried out:
|