Sevens Theme Department Store Düsseldorf
Difficult local conditions: adjacent buildings with 1 and 2 basement floors respectively, underground railway, close to the ditch of the boulevard Königsallee.
Consequence: topped construction method
5 basement floors, 4 of them parking floors, 20 m underneath the level of the boulevard Königsallee; in-situ concrete diaphragm wall, precast pillars, slices of diaphragm walls; basement floor ceilings are 30 cm thick flat floor slabs of reinforced concrete, white sump pan with 30 cm thick outer walls of reinforced concrete.
Country:
Germany, Federal State of Nordrhein-Westfalen
Client:
Sevens Düsseldorf GbR
Construction period:
19 months
Services:
of the load-bearing structure planning
|
|