Schüßler-Plan Homepage
Enterprise Service range Contact Jobs home Deutsch
 
Structural engineering
Airport construction
Concrete and steel bridge construction
Railway construction
Road construction
Tunnel construction
Construction and project management
Surveying
Landscape and environmental planning
Development planning
Structural engineering
 
Airport construction
Concrete and steel bridge construction
Railway constrction
Road construction
Tunnel construction
Construction and project management
Surveying
Landscape and environmental planning
Development planning

Moscow City

ARAG European head office Düsseldorf

Office Building, GAP 15, Duesseldorf

Sevens Theme Department Store Düsseldorf

BMW Group

Sevens
Theme Department Store Düsseldorf

Difficult local conditions: adjacent buildings with 1 and 2 basement floors respectively, underground railway, close to the ditch of the boulevard Königsallee.
Consequence: topped construction method
5 basement floors, 4 of them parking floors, 20 m underneath the level of the boulevard Königsallee; in-situ concrete diaphragm wall, precast pillars, slices of diaphragm walls; basement floor ceilings are 30 cm thick flat floor slabs of reinforced concrete, white sump pan with 30 cm thick outer walls of reinforced concrete.

Country:
Germany, Federal State of Nordrhein-Westfalen

Client:
Sevens Düsseldorf GbR

Construction period:
19 months

Services:
of the load-bearing structure planning