Sky Train
Düsseldorf Cabtrack
For the connection of the terminal building to the railway network of the DB AG, a fully automatized, driverless operated cabtrack was planned and realized. The distance between the two destinations is 2.5 km.
Country:
Germany, Federal State of Nordrhein-Westfalen
Building owner and originator:
Flughafen Düsseldorf GmbH
Construction period:
1997-2002
Construction costs:
check-in hall including the station of the cabtrack 34.8 million Euro delivery of the cabtrack ready for operation including the 4 stations as well as the remaining infrastructural measures 115.3 million Euro
Work carried out:
| - |
-project control |
| - |
realization of all activities in connection with the support of the project according to GVFG (Law of Community Traffic Financing)
|
| - |
participation in the drawing-up and negotiation of an operator contract with the system supplier including the development of the operator organization, the responsibilities on the side of the building owner and operator |
| - |
development of emergency scenarios with the definition, agreement, enquiry and contractual regulations about the realization of the substitute traffic |
|
|
|
|
|
|
|
|