Schüßler-Plan Homepage
Enterprise Service range Contact Jobs home Deutsch
 
Structural engineering
Airport construction
Concrete and steel bridge construction
Railway construction
Road construction
Tunnel construction
Construction and project management
Surveying
Landscape and environmental planning
Development planning
Structural engineering
 
Airport construction
Concrete and steel bridge construction
Railway construction
Road construction
Tunnel construction
Construction and project management
Surveying
Landscape and environmental planning
Development planning
Flughafen Berlin-Brandenburg International

Flughafen Berlin-Brandenburg International Fluggastterminal

Airport 2000 plus Flughafen Düsseldorf International

Airport Connection Dresden

Airport Connection Köln-Bonn

Sky Train, Düsseldorf Cabtrack

Flughafen Frankfurt am Main

Airport Connection Dresden

Fundamental renewal of the one-track branch route Dresden-Klotzsche - Dresden Grenzstraße,
new construction of the merging and exit lane at the northern end of the train station Dresden-Klotzsche,
one-track continuation of the route from Grenzstraße up to the new terminal as two-track station in tunnel position

Country:
Germany, Free State of Saxony

Client:
Flughafen Dresden GmbH, Deutsche Bahn AG

Construction period:
1997-2002

Construction costs:
tunnel construction approx. 17.9 million Euro
Nesselgrund bridge approx. 1.3 million Euro
construction for a fly-over junction approx. 3.1 million Euro

Services:
Design and structural engineering:

- Preliminary design
- Detailed design
- Tender design and tender documents