|
|
||||||||
|
|
|
|
Enhancement of the Hamburg-Berlin line Section between Büchen station and Hamburg (central station) In conjunction with the planned speed increase up to a 200-230 km/h, preparations must be made to adjust the structures and systems to the changed requirements. Within the Management of a joint venture with Bung Engineers Ltd., Berlin we deal with the field of constructional engineering and tackle the job of technical coordination within the working team. Extent of work: - stocktaking of the 71 railway bridges of the track section - analysis of the eligibility of 53 railway bridges for the planned speed rise Country: Germany, Free Hanseatic City of Hamburg, Federal State of Schleswig-Holstein Client: DB Projekt Verkehrsbau GmbH, PZ 10 Planning period: 2001-2004 Costs: 70 million Euro Services: Design and structural engineering
|