Schüßler-Plan Homepage
Enterprise Service range Contact Jobs home Deutsch
 
Structural engineering
Airport construction
Concrete and steel bridge construction
Railway construction
Road construction
Tunnel construction
Construction and project management
Surveying
Landscape and environmental planning
Development planning
Structural engineering
 
Airport construction
Concrete and steel bridge construction
Railway construction
Road construction
Tunnel construction
Construction and project management
Surveying
Landscape and environmental planning
Development planning
Tuti Khartoum North Bridge in Khartoum, Sudan

Old White Nile Bridge in Khartoum, Sudan

Bridge constructions in the course of the B 96n, 2nd Strelasund crossing

Oder bridge in Frankfurt (Oder)

Pedestrian bridge in the media harbour Düsseldorf

Weißeritztal bridge

Rheinbrücke Wesel

Bridge constructions in the course of the 2nd Strelasund crossing (Federal road B 96n)
With its 126 m high steel pylon, the cable-stayed bridge over the Ziegelgraben is the landmark of the 2nd Strelasund crossing. The complete bridge construction with a length of 2.8 km consits 5 parts of bridges.

Technical data of the bridge constructions:
- one prestressed concrete bridge,
total length 327 m
- one steel composite bridge with V-supports in the main field, 6 fields, total length 317 m
- one cable-stayed bridge with steel pylon and steel deck, 6 fields, total length around 583 m
- three steel composite bridges as ten-field structures, total length around 3 × 532 m

Country:
Germany, Federal State of Mecklenburg-Vorpommern

Client:
DEGES – Deutsche Einheit Fernstraßenplanungs- und –bau GmbH, Berlin

Planning period:
2000-2003

Construction costs:
approx. 70 million Euro

Services:

Preliminary design
- Tender design and tender documents