Border bridge Frankfurt (Oder)
(Federal road B 5)
The construction takes the federal road B 5 over the river Oder and connects the two countries Germany and Poland. A bridge test in 1994 revealed a need to replace the existing con-struction. The new construction had to be carried out taking border checkpoints and special flood protection requirements into consideration.
As a preferential variant for the new construc-tion, a arche bridge with rigid connecting boun-dary fields and a continuous road surface in com-posite steel style was selected.
Technical data:
Total length: 252 m
Main arch: 75 m
Width: 15 m
Country:
Germany, Federal State of Brandenburg
Client:
Federal Republic of Germany, represented by the Administration of Road Construction of Brandenburg, represented by the Brandenburg Road Construction Authority Frankfurt (Oder)
Planning period:
1996 - 2002
Costs:
9.8 million Euro
Services:
| - |
Preliminary design |
| - |
Tender design and tender documents |
| - |
Detailed design |
|