Schüßler-Plan Homepage
Enterprise Service range Contact Jobs home Deutsch
 
Structural engineering
Airport construction
Concrete and steel bridge construction
Railway construction
Road construction
Tunnel construction
Construction and project management
Surveying
Landscape and environmental planning
Development planning

Structural engineering
 
Airport construction
Concrete and steel bridge construction
Railway construction
Road construction
Tunnel construction
Construction and project management
Surveying
Landscape and environmental planning
Development planning
Tuti Khartoum North Bridge in Khartoum, Sudan

Old White Nile Bridge in Khartoum, Sudan

Strelasund crossing

Oder bridge in Frankfurt (Oder), national road B 5

Pedestrian bridge in the media harbour Düsseldorf

Weißeritztal bridge

Rheinbrücke Wesel

Border bridge Frankfurt (Oder)
(Federal road B 5)

The construction takes the federal road B 5 over the river Oder and connects the two countries Germany and Poland. A bridge test in 1994 revealed a need to replace the existing con-struction. The new construction had to be carried out taking border checkpoints and special flood protection requirements into consideration.
As a preferential variant for the new construc-tion, a arche bridge with rigid connecting boun-dary fields and a continuous road surface in com-posite steel style was selected.

Technical data:
Total length: 252 m
Main arch: 75 m
Width: 15 m

Country:
Germany, Federal State of Brandenburg

Client:
Federal Republic of Germany, represented by the Administration of Road Construction of Brandenburg, represented by the Brandenburg Road Construction Authority Frankfurt (Oder)

Planning period:
1996 - 2002

Costs:
9.8 million Euro

Services:

- Preliminary design
- Tender design and tender documents
- Detailed design