Schüßler-Plan Homepage
Enterprise Service range Contact Jobs home Deutsch
 
Structural engineering
Airport construction
Concrete and steel bridge construction
Railway construction
Road construction
Tunnel construction
Construction and project management
Surveying
Landscape and environmental planning
Development planning
Structural engineering
 
Airport construction
Concrete and steel bridge construction
Railway constrction
Road construction
Tunnel construction
Construction and project management
Surveying
Landscape and environmental planning
Development planning

Moscow City

 ARAG European head office Düsseldorf

Office Building, GAP 15, Duesseldorf

Sevens Theme Department Store Düsseldorf

BMW Group

ARAG European head office Düsseldorf

The office building was planned as a high-rise building with 30 upper storeys, ground floor and 2 basement storeys. The foundation was realised on a 3.50 m thick foundation plate as a spread foundation.

The basement storeys are constructed as white sump pan.

The high-rise building is stabilised by two cores situated at the two outward ends. The wind strain was analysed in the model test. The results were considered in the static calculation of the building circumference and height.

Country:
Germany, Federal State of Nordrhein-Westfalen

Client:
Allgemeine Rechtsschutz-Versicherungs-AG, Düsseldorf

Construction period:
1998-2000

Services:

- determination of the load-bearing structure concept with consideration given to constructiion and economic aspects
- elaboration of the entire load-bearing structure planning stages 1-6